Permatang Damar Laut

Public Display of EIA Report (Second Schedule) for the "Proposed Reclamation and Dredging Works for the Penang South Reclamation (PSR) Project, Penang." 2017

Public Display of EIA Report (Second Schedule) for the “Proposed Reclamation and Dredging Works for the Penang South Reclamation (PSR) Project, Penang.” 2017

Public Display of EIA Report (Second Schedule) for the “Proposed Reclamation and Dredging Works for the Penang South Reclamation (PSR) Project, Penang.” Date: 24 May – 23 June 2017 Time: 8.00 am – 5.00 pm (Mondays – Fridays, except Public […]

Press Statement by PBAPP - 30 November 2016 - PLEASE PREPARE FOR THE WATER SUPPLY INTERRUPTION AT BATU MAUNG AND PERMATANG DAMAR LAUT ON SATURDAY (3/12/2016)

Press Statement by PBAPP – 30 November 2016 – PLEASE PREPARE FOR THE WATER SUPPLY INTERRUPTION AT BATU MAUNG AND PERMATANG DAMAR LAUT ON SATURDAY (3/12/2016)

10-Hour Water Supply Interruption In Southern Penang From Saturday Night Till Sunday Morning (20-21Aug2016)

There will be 10-hour water supply interruption in southern of Penang Island, in areas from Sungai Tiram to Gertak Sanggul, from 10.00pm till 8.00am this weekend. Pipe connection works will be carried out at 4 locations at Lebuh Sungai Ara […]